A SERVICE OF

logo

Chapter 3: Installation
3-2 ESX-1320/ESX-1380 Installation Guide
3.1 UNPACKING THE ESX
Unpack the ESX as follows:
1. Remove the shipping material covering the ESX.
2. Verify the contents of the packing carton. The carton, as shipped,
should contain the following items:
ESX-13XX
Firmware Images, 2
Grounding strap
RJ45 Adapter Kit
Release Notes
Rack Mounting Kit
Accessory Kit
ESX-1320/ESX-1380 Installation Guide
ESX-1320/ESX-1380 Local Management Guide
3. If any of these items are missing, contact Cabletron Systems Technical
Support immediately. For help, refer to Section 1.5.
4. Carefully remove the ESX from the shipping box.
5. Visually inspect the ESX. If there are any signs of damage, contact
Cabletron Systems Technical Support immediately. For help, refer to
Section 1.5.