8
6
71
86
3
23
26
Grease
Hole
4. Insert the connector of the lower wire harness (A)
into the socket of the Upper Wire Harness (13).
The connector should slide easily into the sock
-
et and snap into place. If the connector does not
slide easily and snap into place, turn the connector
over and then insert it.
Make sure that the connector and wire appear as
shown in the inset drawing. IF THE CONNEC-
TOR IS NOT INSERTED PROPERLY, THE CON-
SOLE MAY BE DAMAGED WHEN THE POWER
IS TURNED ON.
Pull the excess lower wire harness (A) out of
the Mech Assembly (6) and push it and the
Upper Wire Harness (13) into the Upright (3).
Insert the Mech Assembly (6) into the Base (1).
Attach the Mech Assembly to the Upright (3) with
a 1/2” x 66mm Carriage Bolt (79) and a 1/2”
Nylon Jamnut (78).
Do not tighten the Locknut
yet.
Attach the Mech Assembly (6) to the Base (1)
with four M10 Nylon Locknuts (71).
Tighten the 1/2” Nylon Jamnut (78).
4
3
1
71
79
78
6
71
13
13
13
A
5
71
71
31
91
Front
29
23
5. Press the Front Leg Foot (29) onto the bottom of
the Front Leg (31). Note that the front of the
Front Leg Foot is taller than the back.
Attach the Bench Rail (23), with the hook on the
bottom, to the Front Leg (31) with two M10 x
53mm Carriage Bolts (91) and two M10 Nylon
Locknuts (71).
6.
Grease an M10 x 103mm Bolt (86) using the
included grease pack.
Attach the Bench Rail (23)
to the Upright (3) with the Bolt and an M10 Nylon
Locknut (71).
Make sure the Bolt is inserted
through the indicated hole in the Bench Rail.
Do not overtighten the Locknut; the Bench
Rail must be able to pivot easily.
T
ighten the Storage Knob (26) into the Upright (3)
and the Bench Rail (23).
A