14
After the resistance system is assembled, the tension on the upper cable (B) will need to be adjusted. Also, the
upper cable can stretch slightly when it is first used. When this occurs, the upper cable tension will need to be
readjusted. Follow the steps below to adjust the upper cable tension.
1.
Connect the two Tension Gauges (107, 108)
together using the magnet.
2. Plug in the resistance system as described in
PLUGGING IN THE RESISTANCE SYSTEM on
page 17. Use the Console (not shown) to adjust
the resistance setting of the system to the highest
setting, as described in ADJUSTING THE RESIS-
TANCE on page 16.
Squeeze the upper cable (B) together near a
Large Pulley (17). Hook the ends of the Tension
Gauges (107, 108) around the upper cable as
shown. Do not hook the ends of the Tension
Gauges around the Tether (61), which is
attached to the back of the Pulley Bracket
(10).
Slide the Tension Gauges (107, 108) next to the
Large Pulley (17) as shown in the inset drawing.
3. Locate the 3/8” x 38mm Tension Screw (106) on
each end of the Resistance Bar (9).
Alternately
tighten each Screw one turn at a time until the
two Tension Gauges (107, 108) are pulled apart
by the upper cable (B).
The upper cable tension is now properly adjusted.
1
2
3
17
B
B
B
108
108
107
107
107
108
B
106
9
10
61
17
Magnet
107
108
UPPER CABLE ADJUSTMENT