Weider WESY85100 Home Gym User Manual


 
11
CABLE ASSEMBLY
19. Note: This assembly step shows how to
complete the assembly of several pre-
attached parts.
The 5/8” x 9/16” Spacer (73) has been pre-
attached on the outside of the 3 1/2” Low
Pulley (77) for shipping purposes. Remove
the 3/8” Nylon Locknut (21), the Spacer, and
the Pulley from the 3/8” x 3 3/4” Bolt (71). Do
not remove the Bolt. The Bolt has been
shown removed for part identification.
Reattach the 3 1/2” Low Pulley (77), with the
5/8” x 9/16” Spacer (73) between the Pulley
and the Press Frame (17). Do not tighten
the 3/8” Nylon Locknut (21) yet. Be sure
that the 3/8” x 3 3/4” Bolt (71), the 3/8” Flat
Washer (9), the 5/8” x 9/16” Spacer (73),
the 3 1/2” Low Pulley (77), and the 3/8”
Nylon Locknut (21) are oriented as shown.
20. Locate the Short Cable (58). Route the
Short Cable (58) under the 3 1/2” Low Pulley
(77). Be sure that the end of the Cable with
the ball is on the indicated side of the
Press Frame (17) and that the Cable is
between the Pulley and the crossbar on
the Press Frame. Tighten the 3/8” Nylon
Locknut (21) and the 3/8” x 3 3/4” Bolt (not
shown).
19
20
21
17
77
73
9
71
58
Crossbar
Ball
77
17
21