Weider 831.159820 Home Gym User Manual


 
11
20. Note: The following drawings are shown from
the left side of the weight system, with the
Left Top Frame (3) removed for clarity.
Wrap the High Cable (45) around a 3 1/2” Pulley
(38). Attach the Pulley at the rear hole, inside of
the bracket on the Center Top Frame (14) with a
3/8” x 1 3/4” Bolt (66) and a 3/8” Nylon Locknut
(70).
17.
Locate the High Cable (45). Route the Cable up
through the Left Top Frame (3) and around a
3 1/2” Pulley (38). Attach the Pulley inside the Top
Frame with a 3/8” x 2 3/4” Bolt (81), two 3/8”
Washers (75), two 1/2” Spacers (34), and a 3/8”
Nylon Locknut (70).
18. Route the High Cable (45) around a 3 1/2” Pulley
(38) and down through the Left Top Frame (3).
Attach the Pulley and a Cable Trap (91) inside
the Top Frame with a 3/8” x 2 3/4” Bolt (81), two
3/8” Washers (75), two 1/2” Spacers (34), and a
3/8” Nylon Locknut (70). Be sure the Cable Trap
is turned to hold the Cable in the groove of
the Pulley.
Note: To complete this step, it may be neces-
sary to loosen the four indicated 5/16” Nylon
Locknuts (71). Retighten the Locknuts when
this step is completed.
19. Remove the preassembled 3 1/2” Pulleys (38)
from a Double “U”-Bracket (56).
Wrap the High Cable (45) around a 3 1/2” Pulley
(38). Attach the Pulley to the single hole side of a
Double “U”-Bracket (56) with a 3/8” x 2” Bolt (62)
and a 3/8” Nylon Locknut (70).
38
45
75
70
81
75
34
3
34
17
3
34
75
34
75
81
38
70
71
91
45
18
70
56
38
62
45
19
38
66
70
45
14
20
CABLE ASSEMBLY
IMPORTANT: While assembling the cables, do
not over tighten the locknuts attaching the pul-
leys; the pulleys must be able to turn freely.
Refer to the CABLE DIAGRAMS and CABLE ID
CHART on pages 24 and 25 for proper cable
routing and help identifying the cables.