Stamina Products 55-1539 Home Gym User Manual


 
ASSEMBLY INSTRUCTIONS
Shaft
Shaft
9
Nylon Bed
(10) Handrail
(10) Handrail
LEFT
RIGHT
STEP 13: Verify that the handlebars function correctly before using the Therapy Inversion System.
Move the Nylon Bed on the MAIN FRAME(4) backward toward the inverted position. The HANDRAILS(10)
must move forward as the MAIN FRAME(4) moves backward. If the HANDRAILS(10) do not move
forward check
ASSEMBLY STEPS 2, 11, and 12.
STEP 11: Attach the LINKAGE(7) onto the LEFT HANDRAIL ASSEMBLY(8) with the LOCKING
KNOB(11). Slide the LEFT HANDRAIL ASSEMBLY(8) onto the SHAFT in the FRONT FRAME(1)
and secure in position with the LOCKING KNOB(11). Repeat on other side.
STEP 10: Slide the LEFT and RIGHT PROTECTIVE COVERS(26, 27) onto each side of the BASE
ASSEMBLY. Make sure the SHAFTS on the FRONT FRAME(1) poke out through the hole on the
PROTECTIVE COVERS(26, 27).
NOTE:
Do not secure the
PROTECTIVE COVERS(26, 27) to the FOLDING LINKAGES(3) with the
SECURING STRAPS on the covers until STEP 12.
STEP 12: Attach the LINKAGES(7) onto the LEFT and RIGHT PIVOT ARMS(5, 6) with BOLTS
(M8 x 25mm)(46), WASHERS(M8)(51), and NYLOCK NUTS(M8)(49). DO NOT OVER TIGHTEN THE
BOLTS. Pull the
PROTECTIVE COVERS(26, 27) down until the bottom of the covers are slightly lower
than the
FOLDING LINKAGES(3). Secure the PROTECTIVE COVERS(26, 27) to the FOLDING
LINKAGES with the SECURING STRAPS on the covers.
NOTE: When the
PROTECTIVE COVERS(26, 27) are assembled correctly the FOLDING LINKAGES
(3) should not be visible.