Spirit ZE20 Fitness Equipment User Manual


 
ZE20
6
STEP 5
1. Install the Handle Bar Cover Front onto the Front Post with 1pc of M5x15m/m Button
Head Socket Screws.
(As shown in Fig. 12)
2. Take the Fix Handle Bar through the Hand Bar Cover Front and install it onto plate with
2pcs of M8x20m/m Button Head Socket Screws.
(As shown in Fig. 13)
3. Install the Handle Bar Cover Back onto the Front Post with 1pc of M5x15m/m Button
Head Socket Screws.
(As shown in Fig. 14)
STEP 6
Install the Lower Swing Bar into the Left and Right Swing Bar Upper and fix it by using
the Tension Adjuster.
(As shown in Fig. 15)
STEP 7
Install the Plastic Insert For Swing Bar (Lower End) into the Front Post and install Left
and Right Swing Bar Upper with 2pcs of M8x20m/m Button Head Socket Screws and
2pcs of 5/16”x23x1.5T Flat Washers by using the M5 Allen Wrench.
(As shown in Fig. 16~18)
STEP 8
Install the Left and Right Pedal Bar into the U Shape Plate For Pedal with 2pcs of
M8x50m/m Button Head Socket Screws, 2pcs of 5/16”x23x1.5T Flat Washers and
2pcs of M8 Nylon Nuts by using the N Wrench and the M5 Allen Wrench.
(As shown in Fig. 19)
STEP 9
Install the Swing Bar Upper Cover Front and the Swing Bar Upper Cover Back into the
Front Post with 4pcs of M4x30m/m Self Tapping Screws. And plug the two Hand Pulse
Cables into the Socket at back of Console.
(As shown in Fig. 20~21)
STEP 10
Install the Drink Bottle Holder onto the Front Post with 2pcs of M5x15m/m Socket Head
Cap Screws.
(As shown in Fig. 22)