ZE20
5
ASSEMBLY PACK CHECK LIST
■
■■
■
M8x20mm Button Head Socket Screw (4pcs)
■
■■
■
M8x15mm Hex Head Screw (6pcs)
■
■■
■
M8x50mm Button Head Socket Screw (2pcs)
■
■■
■
M8x45mm Button Head Socket Screw (4pcs)
■
■■
■
M4x30mm Self Tapping Screw (4pcs)
■
■■
■
5/16” x 19 x 1.5T Curve Washer (6pcs)
■
■■
■
5/16”x23x1.5T Flat Washer (8pcs)
■
■■
■
M8 Nylon Nut (2pcs)
■
■■
■
13/14mm N Wrench (1pc)
■
■■
■
M5 Allen Wrench (1pc)
■
■■
■
Screwdriver(1pc)
Assembly
■
■■
■ STEP 1
Install the Front and rear stabilizer into the Frame Base Support with 4pcs of M8x45m/m
Hex Head Screws and 4pcs of 5/16”x23x1.5T Flat Washers. Then tightly fasten 4pcs of
M5x38m/m Self Tapping Screws of the Front and rear Stabilizer Cover by using the
13/14mm N Allen Wrench and Screw Driver.
(As shown in Fig.1~7)
■
■■
■ STEP 2
Connect the Computer Cable (Upper) with Computer Cable (Lower).
(As shown in Fig. 8)
■
■■
■ STEP 3
Install the Front Post into the Main Frame with 6pcs of M8x15m/m Hex Head Screws
and 6pcs ofψ 5/16”xψ 19 x2T Curve Washers by using the 13/14mm N Allen Wrench .
(As shown in Fig. 9)
■
■■
■ STEP 4
Connect the Computer Cable (Upper) with the Hand Pulse Cable. Install the Console
with 4pcs of M5x15m/m Button Head Socket Screws by using the Screw Driver.
(As shown in Fig. 10~11)
Assembly Instructions