XT200. / XT 600 / XT 800
8
ASSEMBLY PACK CHECK LIST (XT200 /XT600)
(8 pcs) 5/16" x 15m/m Button Head Socket Screw
(4 pcs) 5/16" x 2" Button Head Socket Screw
(4 pcs) 8 x 23 x 1.5T Curve Washer
(2 pcs) 5/16" x 2-3/4" Button Head Socket Screw
(2 pcs) 5/16" x 1-1/2" Button Head Socket Screw
(4 pcs) 8 x 23 x 1.5T Flat Washer
(6 pcs) 3.5x38 m/m Self Tapping Screw
(1pc) Safety Key
(1 pc) Deck / Belt Lubricant
(1 pc) Combination M5 Allen Wrench & Screwdriver
(1 pc) M6 Allen Wrench
Assembly (XT200 /XT600)
Unpack the treadmill and locate the hardware pack. The hardware pack is separated into:
one section containing tools and four sections labeled steps 1-4 which contain the hardware
needed for assembly of each step. The assembly steps below are numbered one through
four and correspond to the hardware in the numbered sections of the hardware pack.
Remove only the hardware for the step you are currently assembling to avoid confusion and
mix-ups.
STEP 1
1. Take the Left and Right upright tubes and slip the upright covers onto the tubes
(observe the cover orientation is correct). Connect the Middle Console Cable that
exits from the bottom of the right upright tube with the lower Console Cable. Install
the Left and Right (L & R) Uprights into the Left and Right Receiving Tubes. Be
careful not to pinch the wire when installing the upright.
2. Install and hand tighten the 2pcs of 3/8” x 2” Button Head Socket Screw and 2pcs of
3/8” split washer into the top hole on the sides of the L & R tubes. Then install and
hand tighten the 6pcs of 5/16”x 5/8” Button Head Socket Screw in the remaining
holes on the sides and front of the L & R tubes. Do not tighten these screws until
assembly is complete.