11/05 ID# 21112201
7
Fill hole completely with concrete.
7.
1" (2.54 cm)
1" (2.54 cm)
FILL TO
HERE
8.
Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions
several times while concrete is curing.
1" (2.54 cm)
SIDE VIEW
DRAINAGE HILL
IMPORTANT!: CONTINUE ON TO NEXT STEP.
DO NOT
WAIT FOR CONCRETE TO CURE.
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO
NEXT STEP. CONCRETE MUST
CURE.
PLAYING SURFACE