14
WALL MOUNT INSTALLATION – REAR VENT
***This installation only applied with the purchase of a duct cover.
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
-
Decide the location of the venting pipe from the hood to the outside. Refer to Figure 21.
-
A straight, short venting run will allow the hood to perform more efficiently.
-
Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.
-
Use duct tape to seal the joints between pipe sections.
-
If necessary, prepare back wall frame with cross framing lumber for secure installation.
-
Using references on Table 2 and measurements on Page 22-23, decide the level of the
lumber. Refer to Figure 22.
Hood Preparation before Installation
-
Temporarily wire the hood to test for proper operation before installing.
-
Peel protective film off the hood and the duct cover (if any).
-
Remove the screws on the vent cover (rear) and cut along the line of the inner vent
cover (rear) opening. Refer to Figure 23.
-
Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 24.
Figure 21 Figure 22
Inner Vent
Cover (Rear) Reversed
Vent Cover
(Rear)
Figure 23 Figure 24