Kobe Range Hoods CH7930SQB Elliptical Trainer User Manual


 
11
WALL MOUNT INSTALLATION – TOP VENT
***This installation only applied with the purchase of a duct cover.
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
-
Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.
-
A straight, short venting run will allow the hood to perform more efficiently.
-
Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.
-
Use duct tape to seal the joints between pipe sections.
-
If necessary, prepare back wall frame with cross framing lumber for secure installation.
-
Using references on Table 2 and measurements on Page 22-23, decide the level of the
lumber. Refer to Figure 14.
Hood Preparation before Installation
-
Temporarily wire the hood to test for proper operation before installing.
-
Peel protective film off the hood and the duct cover (if any).
-
Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.
Figure 13 Figure 14
6" Round Vent 7" Round Vent 3-1/4" x 10" Vent
Figure 15