Impex PRO 5 Home Gym User Manual


 
STEP 3 (See Diagram 3)
A.) Insert the Leg Developer Holder (#18) into the opening on the Front Stabilizer (#1). Secure
it with a Lock Knob (#53).
B.) Attach the Leg Developer (#6) to the Leg Developer Holder (#18). Secure it with an Axle
(#54), two ¾” Washers (#42), and M10 x 5/8” Allen Bolts (#37).
C.) Insert one Foam Roll Tube (#12) halfway through the hole on the Leg Developer Holder
(#18). Insert two Foam Roll Tubes (#12) halfway through the two holes on the Leg
Developer (#6). Push six Foam Rolls (#22) onto the Foam Roll Tubes from both sides. Plug
six Foam Roll End Caps (#33) to each end of the Foam Rolls.
D.) Push the Olympic Sleeve (#7) onto the weight holder on the Leg Developer (#6). Attach the
Spring Clip (#23) to the Sleeve.

DIAGRAM 3
6