Impex MWM 800 Home Gym User Manual


 
STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) Attach the 133” Lower Cable (#53) to the opening on the Leg Developer (#17). Attach a Pulley
(#28) to the opening. Secure it with one 3/8” x 2 5/8” Allen Bolt (#60), two ½” Bushings
(#71), two 3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).
B.) Draw the Cable underneath the Pulley to the open slot on the Vertical Beam (#4). Install
another Pulley as described in Step A.
C.) Draw the Cable underneath the Pulley then upward to the Angled Double Floating Bracket
(#24) previously installed. Attach a Pulley to the open bracket. Secure it with one 3/8” x 1 ¾”
Allen Bolt (#61), two 3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).
D.) Draw the Cable around the Pulley the downward to the open bracket on the Main Base Frame
(#2). Install another Pulley.
E.) Draw the Cable around the Pulley then upward to the Flat Double Floating Pulley Bracket
(#23) previously installed. Install another Pulley.
F.) Draw the Cable around the Pulley then connect the Cable to the Main Base Frame with two
Hooks (#46) and a 9-linked Chain (#49).
G.) Adjust the tension of the Cable Loop System by adjusting the length of the Chain.
17