STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) Attach the 153” Upper Cable (#34) to the opening at the front of the Upper
Frame (#5). Note: The Ball Stopper on the cable should be underneath the
Frame.
B.) Attach a Pulley (#47) to the opening. Secure it with one M10 x 2 ½” Allen Bolt
(#74), two Ø 7/8” x 5/8” Pulley Bushings (#43), and one M10 Aircraft Nut (#82).
C.) Draw the Cable towards the back of the machine to the opening on the Upper
Frame. Attach a Pulley to the opening. Secure it with one M10 x 3” Allen Bolt
(#76), two Ø 7/8” x ¾” Long Pulley Bushings (#42), and one M10 Aircraft Nut
(#82).
D.) Draw the Cable around the Pulley then pull back towards the open bracket on
the Front Press Base (#11).
E.) Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#72),
two Ø ¾” Washers (#80), and one M10 Aircraft Nut (#82).
F.) Draw the Cable around the Pulley through the hole on the Vertical Frame to the
open bracket on the rear of Vertical Frame (#4). Repeat Procedure E above to
install another Pulley.
G.) Draw the Cable around the Pulley then downward. Attach the Cable to in
between the two Double Floating Pulley Brackets (#29). Repeat Procedure E to
install a Pulley. Let the bracket hanging for now.
H.) Draw the Cable around the Pulley then pull the Cable upward to the open
bracket on the Top Socket Assembly (#6).
I.) Attach a Pulley to the bracket. Secure it with one M10 x 2” Allen Bolt (#73), one
L-shaped Cable Retainer (#26), two Ø ¾” Washers (#80), and one M10 Aircraft
Nut (#82).
J.) Draw the Cable to the other open bracket on the Top Socket Assembly. Repeat
Procedure I to install another Pulley.
K.) Pull the Cable downward between the two Guide Rods, through a Ø 1 ¾” Rubber
Bumper (#52) to the Selector Rod (#28). Fully thread the bolt at the end of the
Cable into the top opening on the Selector Rod.
L.) Connect the Lat Bar (#19) to the Upper Cable with a C-clip (#38).
15