Impex IGS-09 Home Gym User Manual


 
STEP 4 (See Diagram 4)
A.) Insert the Leg Developer Holder (#41) into the opening on the Front Stabilizer (#40).
Secure it with the Lock Knob (#6).
B.) Attach the Leg Developer (#38) to the bracket on the Leg Developer Holder (#41). Secure
it with a M12 x 2 3/8” Axle (#36) and M12 Allen Bolt (#45).
C.) Secure the Leg Developer (#38) with a 4” Lock Pin (#36). Remove the Pin when using the
Leg Developer.
D.) Insert a Foam Roll Tube (#32) halfway through the hole on the Leg Developer Holder
(#41). Insert two Foam Roll Tubes (#32) halfway through the holes on the Leg Developer
(#38).
E.) Push six Foam Rolls (#33) onto the Tubes from both sides. Plug six Foam Roll End Caps
(#34) to the ends.
F.) Attach the Olympic Sleeve (#5) onto the weight post on the Leg Developer. Attach the
Spring Clip (#44) onto the Olympic Sleeve.
DIAGRAM 4
7