
............ www.truemfg.com ............
INSTALLATION / OPERATION INSTRUCTIONS
True Food Service Equipment, Inc.
5
5
Step 2
A. Place packing material behind cabinet as a
cushion. Carefully lay the unit on its back to
remove skid.
When lifting unit remember to
leave the cabinet upright for 24 hours before
plugging into power source.
B. Remove skid by unscrewing all base rail anchor
brackets. Place skid to the side.
C. Carefully lift cabinet upright.
LOCATING
Leveling Shims
Castor
Snug Fi
Here
Leveling Shims
Side View
Top View
Left Shim
In Position
Castor
Mountin
Plate
Removing
skid from
bottom of
cabinet.
INSTALLATION OF LEGS AND CASTORS
Important Safeguard for installation of leg/castor (Images 1 & 2 demonstrate procedure)
Step 3
Leveling Castors
Four sets of shims have been provided in warranty
packet for leveling castored units positioned on uneven
floors. Shims must be positioned between cabinet and
castor mounting plate.
(See image 1 below).
If the cabinet is not level prop up one end of the cabinet
between castors with a 6” block.
(See image 2)
NOTE:
Do not push block more than 5” under cabinet.
Loosen castor bolts with an adjustable wrench enough
to slide shims between the castor mounting plate and
cabinet bottom.
Install the desired number of shims (in pairs as shown
in image 1), making sure the slots in the shim are in
contact with the castor mounting bolts.
Tighten and secure the shims and castor(s). Remove 6”
block and check to determine if cabinet is level. Repeat
process until cabinet is level.
Ensure that the drain hose or hoses are positioned in the
pan.
°
°
F°
35°
6”
(Image 1.)
(Image 2.)