A SERVICE OF

logo

INSTALLATION
CRYSTALVIEW PLUS INSTALLATION AND OPERATIONS MANUAL
11
Installation
Please refer to the safety section first before proceeding with any
installation or configuration of the CrystalView Plus.
Installation of the CrystalView Plus consists of three easy steps.
1. Connect the cables to the equipment.
2. Applying power.
3. Adjust the video channels (if needed).
More advanced users can refer to Appendix E for a quick installation
and video compensation adjustment guide.
For systems that only require running Video through the CrystalView
Plus with no keyboard or mouse or use extended cable lengths
between the local unit and a computer or KVM switch, supplemental
power should be supplied to the Local Unit. The Local Unit gets its
power from the keyboard port of the CPU. Rose Electronics can
supply a power transformer that connects to the Local Unit to
provide this power. This power transformer can be ordered from
Rose Electronics (P/N TFR-05D400FSUB)
When installing the CrystalView Plus, locate the Local unit as close
as possible to the CPU. Keep the CPU and KVM cables as short as
possible but still give some freedom of movement. Using shorter
cables keeps the video noise to a minimum and reduces installation
costs. You can mount the CrystalView Plus in a CPU rack with the
optional rack mount kit. When mounting in a rack, follow the
instructions in Appendix C and Appendix D and assure that the
operating temperature of the Local and Remote Units do not exceed
the maximum ratings. Provide adequate air circulation to assure that
the maximum operating temperature is not exceeded.
Wherever the CrystalView Plus Local and Remote Units are located,
they should be on a secure surface and free from obstructions and
objects that may cause damage to the units.