Introduction
The terminal is fully assembled at the factory. This chapter explains the
mounting options and how to connect optional hardware components
to the terminal.
Installation Summary
The terminal should be removed from the shipping packaging and
visual checks made to verify the correct hardware configuration. The
system is then configured and any communication cables are
connected.
Only after inspection should the power cord be attached to the system
and then connected to the AC power source. Power-up self-tests will
run to verify basic functionality.
ROM-based setup should be used to configure network options. Full
configuration depends upon the system server and the management
Web site.