![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/0/46/0464858e-81cf-479f-b76c-909339505750/0464858e-81cf-479f-b76c-909339505750-bg4d.png)
Preparing the water connection
The connection to the household
water supply must be installed
before the appliance is installed.
^
Turn off the main water valve to prevent
damage caused by leaking water.
^
Attach the connecting pipe to the
shut-off valve, according to the
instructions supplied by the
manufacturer of the ice cube maker
installation kit.
^
Install the connecting pipe. Always
observe the indicated clearance
dimensions to prevent damage to the
connecting pipe when pushing in the
appliance.
^ Secure the connecting pipe to the
floor with adhesive tape.
^ You may now proceed to install the
appliance. See "Installing the
appliance".
Plumbing
77