A SERVICE OF

logo

12
Installation
36" Island Vent Hood
10
Step
Connect
Electrical
Verify that power is turned off at the source.
CAUTION
If house wiring is not 2-wire with a
ground wire, a ground must be
provided by the installer.
When house wiring is aluminum,
be sure to use U.L. approved anti-
oxidant compound and alumi-
num-to-copper connectors.
WARNING
• Install strain relief into the knockout of the
junction box cover.
• Insert house wiring through strain relief and
tighten.
• Connect white leads to branch circuit white
lead.
• Connect black leads to branch circuit black
lead.
• Connect green/yellow leads to branch
circuit green or bare ground lead.
• Secure all connections with wire nuts on
each electrical connector.
• Push wires into junction box and replace
cover. Be sure wires are not pinched.
9
Step
Install
Hood
Note: TWO PEOPLE ARE REQUIRED TO
COMPLETE THIS INSTALLATION!
• Lift the hood up to the support frame.
Carefully align the hood mounting studs
into the support frame holes, and at the
same time, guide the hood duct connector
into the house duct.
• Install 4 nuts and lock washers to the mount-
ing studs. Tighten with a 10mm wrench.
• Check hood level in both directions.
• Check to be sure that the duct is positioned
over the hood connector.
• Seal the duct connection with duct tape.
Note: Do not drive screws through lower duct
connection. Doing so will prevent proper
damper operation.
Align
Mounting
Studs
Align Duct
Connector to
House Duct
Stop Screw
Install
4 lock
washer
and 4 Nuts
Bottom
Duct
Cover