![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/b/1e/b1e98d54-cd34-4663-abef-c290dcf1374d/b1e98d54-cd34-4663-abef-c290dcf1374d-bge.png)
10
• Install the Switch in a site free from strong electromagnetic
field generators (such as motors), vibration, dust, and direct
exposure to sunlight.
• Leave at least 10cm of space to the front and rear of the
Switch for ventilation.
• Install the Switch on a sturdy, level surface that can support
its weight, or in an EIA standard-size equipment rack. For
information on rack installation, see the next section, Rack
Mounting.
• When installing the Switch on a level surface, attach the
rubber pads (feet) to the bottom. The rubber feet cushion the
switch and helps protect the case from scratches.
Figure 1 – Attach the adhesive rubber pads to the bottom
Rack Mounting
The Switch can be mounted in an EIA standard-size, 19-inch rack or
chassis, which can be located in a wiring closet with other equipment.
Attach the mounting brackets to the Switch’s side panels (one on each
side), and secure them with the provided screws.