
2-1
Chapter 2
Installation
This chapter describes the physical layout of the 9G421-02/9G429-02 module and
explains preparation and installation procedures for use in a SmartSwitch 9000
chassis. The 9G421-02/9G429-02 occupies a single slot in the SmartSwitch 9000
chassis. Install the 9G421-02/9G429-02 by following the steps in
Unpacking the
Module
below.
Tools Needed
¥ Phillips screwdriver
Unpacking the Module
1. Carefully remove the module from the shipping box. (Save the box and
packing materials in the event it must be reshipped.)
2. Remove the module from the plastic bag. Observe all precautions to prevent
damage from Electrostatic Discharge (ESD).
3. Carefully examine the module, checking for damage. If any damage exists,
DO NOT install the module. Contact Cabletron Systems immediately.
Only qualiÞed personnel should perform installation procedures.
Never expose the moduleÕs components to Electrostatic Discharge. Make sure you
have attached the moduleÕs disposable grounding strap to your wrist and always
place the module on a non-conductive surface.
!
CAUTION
The INB Terminator modules must be installed on the rear of the chassis before
powering up this module. Refer to the INB Terminator Modules Installation
Guide for the installation procedure. The INB Terminator modules are essential to
the proper operation of the bus on the chassis.
NOTE