14
26. Wrap the High Cable (55) under a 90mm Pulley
(48). Attach the Pulley, a Cable Trap (51), and
two Half Finger Guards (43) at the upper hole in
the “U”-bracket (45) with an M10 x 51mm Bolt
(66) and an M10 Nylon Locknut (56).
Make sure
the Cable Trap is oriented to hold the Cable in
the groove of the Pulley and that the Finger
Guards are on the outside of the “U”-bracket.
28. Route the High Cable (55) over a 90mm Pulley
(48) and down through the Top Frame (4). Attach
the Pulley inside of the Top Frame with an M10 x
67mm Bolt (71), two M10 Washers (57), two
12mm Spacers (52), and an M10 Nylon Locknut
(56).
29. Thread an M12 Nut (84) all the way onto the High
Cable (55). Place a Large W
asher (85) on top of
the W
eight
T
ube (24).
T
ighten the High Cable (55) into the W
eight Tube
(24) until all the slack is removed from the cables.
Tighten the M12 Nut (84) against the Large
Washer (85).
27. Route the High Cable (55) up through the Top
Frame (4) and over a 90mm Thin Pulley (47).
Attach the Pulley inside of the Top Frame with the
M10 x 67mm Bolt (71) used in step 25, an 11mm
Spacer (49), an M10 Washer (57), and an M10
Nylon Locknut (56).
26
27
28
29
66
51
56
48
55
43
43
45
55
47
71
71
4
49
57
56
55
52
52
48
57
4
57
56
55
84
85
24