Z8
7
ASSEMBLY PACK CHECK LIST
5/16”x18x1.5T Flat Washer (x4)
5/16”x23x1.5T Curve Washer (x4)
5/16”x1/2”Button Head Socket Screw (x12)
Safety Key (x1)
Lubricant (x1)
M5 Allen Wrench (x1)
M6 Allen Wrench (x1)
Assembly
■
■■
■ STEP 1
Remove all parts from the carton.
■
■■
■ STEP 2
Connect Computer Cable (Lower) with Computer Cable (Middle).
■
■■
■ STEP 3
Hand tighten the Right and Left Handrails into the Frame Base with 8 pcs of 5/16” x
1/2” Button Head Socket Screws, 4 pcs of 5/16” x 18 x 1.5T Flat Washers and 4 pcs of
5/16”x 23 x 1.5T Curve Washers by using the M5 Allen Wrench.
■
■■
■ STEP 4
Connect Computer Cable (Middle) with Computer cable (Upper).
Connect Speed Adjustment Switch w/Cable with Speed Cable (Upper).
And connect Incline Adjustment Switch w/Cable with Incline Cable (Upper).
■
■■
■ STEP 5
Install the Console Support into the Right and Left Handrails with 4 pcs of 5/16” x 1/2”
Button Head Socket Screws by using M5 Allen Wrench.
■ PLEASE LOCK DOWN ALL HARDWARE AFTER THE ACCESSSORIES HAVE
BEEN ASSEMBLED.