Spalding M8809511 Fitness Equipment User Manual


 
4
ID# M8809511 07/06
Fill hole with concrete. Tamp down concrete to release air
pockets and build drainage hill.
Insert J-bolts (1) from mounting plate (3) into cement as shown.
Move assembly around to release any air pockets in cement,
then rest mounting plate on cement drainage hill. Apply some
pressure to level mounting plate on top of drainage hill. Level
mounting plate and square with playing surface. Clean off any
excess cement on mounting plate at this time.
4.
5.
PLAYING SURFACE
3
1
IMPORTANT!
Front of mounting plate (3)
must be parallel with
playing surface.
WARNING!
DO NOT PROCEED UNTIL
CONCRETE HAS CURED! A
MINIMUM OF 72 HOURS. ALLOW
ADDITIONAL TIME FOR COLD,
WET OR HUMID WEATHER.
IMPORTANT!
Check leveling of mounting
plate several times with
carpenter’s level while
concrete is curing.