Seiko Cal.7T62 Watch User Manual


 
16
English
To measure the hourly rate of operation
Use the stopwatch to measure
the time required to complete 1
job.
1
Tachymeter scale indicated by
STOPWATCH second hand gives
the average number of jobs ac-
complished per hour.
2
Ex. 1
STOPWATCH
second hand:
20 seconds
Tachymeter scale: “180”
“180” (tachymeter scale figure) x 1 job
= 180 jobs/hour
Ex. 2: If 15 jobs are completed in 20 seconds:
“180” (tachymeter scale figure) x 15 jobs = 2700 jobs/hour