Kobe Range Hoods CH0330SQB Exercise Bike User Manual


 
9
WALL MOUNT INSTALLATION
***This installation only applied with the purchase
of an optional duct cover:
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD,
PREVENT DEBRIS FROM ENTERING
THE VENT OPENING.
Decide the location of the venting pipe from the
hood to the outside. Refer to Figure 9.
A straight, short venting run will allow the hood
to perform more efficiently.
Try to avoid as many transitions, elbows, and
long run as possible. This may reduce the
performance of the hood.
Use duct tape to seal the joints between pipe
sections.
If necessary, prepare back wall frame with
cross framing lumber for secure installation.
Using references on Table 2 and
measurements on page 16-17, decide the level
of the lumber. Refer to Figure 10.
Hood Preparation before Installation
Temporarily wire the hood to test for proper
operation before installing.
Important: Peel protective film off the hood
and the duct cover (if any).
Attach ducting transition to hood exhaust with
ten (3/16” x 3/8”) screws (included). Refer to
Figure 11.
If necessary, attach two rubber stands
(included) with adhesive tape (included) to the
back corners of the hood.
Use eight (3/16” x 3/8”) screws (included) to
attach the two hood-mounting brackets
(included) to the back of the hood. Refer to
Figure 12.
Figure 9
Figure 10
Figure 11
Figure 12