ASSEMBLY
NOTE: Hand tighten bolts and nylon nuts until machine is fully assembled.
Z
STEP 2
Connect Swing Tube (8) to Swing Arm as shown using:
2 x (23) Bronze Bushing
1 x (26) Washer
1 x (27) Washer
1 x (28) Bolt
Slide Big Roller Pad (39) onto Swing Tube (8) and secure
using:
1 x (37) Collar
1 x (38) Plug
1 x (34) Allen bolt