Impex PHC 710 Home Gym User Manual


 
STEP 3 (See Diagram 3)
A.) Insert the Leg Developer Holder (#9) into the top opening on the Front Stabilizer
(#2). Secure it with a Lock Knob (#33).
B.) Attach the Leg Developer (#10) to the bracket on the Leg Developer Holder (#9).
Secure it with an Axle (#18), two ¾” Washers (#43), and two M10 x 5/8” Allen
Bolts (#40). Insert one Foam Roll Tube (#11) halfway through the hole on the Leg
Developer Holder (#9). Insert two Foam Roll Tubes (#11) halfway through the holes
on the Leg Developer (#10). Push six Foam Rolls (#27) onto the Tubes from both
sides. Plug six Foam Roll End Caps (#26) into the ends.
C.) Slide the Olympic Sleeve (#15) onto the weight post on the Leg Developer (#10).
Attach a Spring Clip (#32) onto the Olympic Sleeve. NOTE: When using the
decline position to do Ab exercise, place at least 30lbs of weights on the post to hold
down the Leg Developer.

DIAGRAM 3
6