Impex EVE-540 Home Gym User Manual


 
STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it
with an Axle (#17), two M10 x ¾” Allen Bolts (#36), and two ¾” Washers (#42).
B.) Insert a Spring (#16) into the slot at the front of Main Frame. Secure the Spring to the
slot with one Spring Spacer (#11) and M6 x ½” Philips Screw (#45). Insert one side of
the U-shaped Lock Pin (#12) into the Slot.
C.) Attach the Bar Holder (#26) to the Leg Developer (#5). Secure it with a L-shaped Lock
Pin (#21).
D.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two
Foam Tubes halfway through the holes on the Leg Developer. Push six Foam Rolls
(#24) onto the Tubes form both ends. Plug six Foam Roll End Caps (#25) into the
Tubes.
E.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a
Spring Clip (#22) to the Sleeve.
F.) Remove the L-shaped Lock Pin and Bar Holder when doing Leg exercises. Insert the
other side of the U-shaped Lock Pin into the hole on Leg Developer to hold the Leg
Developer when doing sit-up exercise.
DIAGRAM 4
8