![](http://pdfasset.owneriq.net/9/99/99928be8-585a-4fea-a787-13aa4007bb57/99928be8-585a-4fea-a787-13aa4007bb57-bg8.png)
STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it
with an Axle (#17), two M10 x ¾” Allen Bolts (#36), and two ∅ ¾” Washers (#42).
B.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two
Foam Tubes halfway through the holes on the Leg Developer (#5). Push six Foam
Rolls (#24) onto the Tubes from both ends. Plug six Foam Roll End Caps (#25) into
the Tubes.
C.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a
Spring Clip (#22) to the Sleeve.
DIAGRAM 4
7