3
01/03 P/N 211560H
24" (61 cm)
36" (91.4 cm)
Ensure ground is level with playing
surface, then dig pole hole.
GROUND
SURFACE
PLAYING
SURFACE
1.
Install threaded ends of J-bolts (1) through holes in
mounting plate (3) and secure as shown.
NOTE: Make sure J-bolts (1) are in the illustrated
position.
NOTE: Nuts on the top of plate are used for leveling
the pole after system is fully assembled.
2.
3
2
2
2
1
3.
1
CONTACT UTILITIES
BEFORE DIGGING.
Install nut (2) to J-bolt (1)
as shown. Repeat
procedure for other three
J-bolts (1).
WARNING
2”
(5.08 cm)
IMPORTANT!
Make sure nuts are 2”
(5.08 cm) from top of J-Bolts.