Graham Field AQ1000/AQ2000 Camping Equipment User Manual


 
AQ1000-INS-LAB-RevC11 9
INSTALLATION
UNPACKING
1. Before unpacking, check for obvious damage to the
carton or its contents. If damage is evident, please
notify the carrier and your Graham-Field equipment
provider.
2. Remove all loose packing from the carton.
3. Carefully remove all components from the carton.
4. Inspect all components. If damage is evident, please
notify the carrier and your Graham-Field equipment
provider.
PUMP AND BUBBLE PAD INSTALLATION
1. Remove all sheets, blankets, and pillows from the bed.
2. Place the bubble pad on the bed mattress with the
tubing at the patient's feet.
installation
wire hanger
foot end
pump
(AQ2000 shown)
mattress
bubble pad
3. Fold open the wire hangers on the back of the pump as
shown above.
4. Use the hangers to hang the pump on the bed's foot
end, as shown above; adjust the hangers to place the
pump in the most upright position (or place the pump
on a at surface easily accessible to the caregiver and/
or doctor).
s NOTICE:Placethedeviceinapositionwherethe
caregiverand/ordoctorcanaccessiteasily.