EVO REV 400 ELLIPTICAL TRAINER
Visit us at: www.evofitness.com
20
ASSEMBLY
STEP 12:
Slide the Hand Rail Frame – Left (7) through the Water Bottle Holder (9) on the Left Upright (5) and secure with M8 x 15mm
Bolt (80) as shown in FIG1. Repeat the procedure on the Right Upright (6).