![](http://pdfasset.owneriq.net/b/b3/bb36129d-36df-43dc-a58a-f828a0ba7176/bb36129d-36df-43dc-a58a-f828a0ba7176-bg9.png)
assembly instructions
-9-
Step 2:
Cap the Squat Base (4) with one 2" Sq
End Plug (50). Attach the Squat Base
(4) to the Base Frame (1) using three
3/8" x 3/4" Hex Head Bolts (82) and
three 3/8" Washers (90). Align the
mounting holes in the link plate (welded
on the Squat Base (4)) with the holes
in the Side Base (2) then attach using
two 1/2" x 3-1/8" Hex Head Bolts (71),
four 1/2" Washers (89) and two 1/2"
Nylon Nuts (93).
Attach the Foot Plate (21) to the Squat
Base (4) using two 3/8" x 3" Hex Head
Bolts (74), four 3/8" Washers (90) and
two 3/8" Nylon Nuts (94).
ASSEMBLY
LINK PLATE