SM21 Unpacking & Assembly Instructions
7
Figure 7. Adjustable crossover cable end detail.
Using a 7/8” wrench, tighten the jam nut onto the adjustable pulley threads as shown in Figure
7. Place a rubber cap on the top of the cable as shown in Figure 7 (right).
Bolt the cable to the weight stacks as shown in Figure 8. Thread the 7/8” nut up on the cable
bolt as shown at left. Screw the bolt down into the weight stack as shown at right. Tighten the
bolt with a 7/8” combination wrench.
Figure 8. Screw the cable into the weight stack.