STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#14) to the bracket on top of the Leg Developer Holder (#5).
Secure it with an Axle (#48), two ∅ ¾” Washers (#45), and two M10 x 5/8” Allen Bolts
(#43). Slide the Olympic Sleeve (#55) onto the post on the Leg Developer. Attach a
Spring Clip (#21) to the Sleeve. Note: When using the decline position to do Ab
exercises, place at least 30lbs of weights on the Sleeve to hold down the Leg Developer.
B.) Insert one Foam Roll Tube (#15) halfway through the hole on the Leg Developer Holder.
Insert two Foam Roll Tubes (#15) halfway through the holes on the Leg Developer (#14).
Push six Foam Rolls (#16) onto the Tubes from both sides. Plug six Foam Roll End Caps
(#33) to the ends.
C.) Attach the Arm Curl Pad (#19) to the Arm Curl Stand (#13). Secure it with two M8 x 5/8”
Hex Bolts (#42) and ∅ 5/8” Washers (#46). Insert the Arm Curl Stand into the top opening
in front of the Seat.
D.) Attach the Curl Bar Holder (#49) to the Leg Developer (#14). Align the holes and secure it
with 2 ¾” L-shaped Pin (#53). Attach a ∅ 3/8” Spring Clip (#54) to the Pin. Attach two
Spring Clips (#21) to both ends of Curl Bar (#50). Place the Curl Bar on the Curl Bar
Holder for Arm Curl exercises.
DIAGRAM 4
7